
Product introduction: |
Wire preventer mainly use in flowing Wells, gas Wells and injection Wells, CBM test well under the pressure test with steel wire belt or paraffin removal operations, provide the instrument string with the well homework pressure buffer and instruments through the transition zone, in the process of the wire up well under dynamic or static seal wellhead, the wellhead pressure fluid leakage, and have the ability to dispose of unusual, and easy to operate, safe and reliable.
|